MEASUREMENT 2
REFLECTIVE ESSAY
After through the fourteen weeks
of classes for measurement 2, I had learnt
the measuring work for the masonry of external and internal
walls, timber floors and stud partitions, staircase structure
and staircase balustrade; floor, wall, ceiling
and staircase finishes as well as painting. All
the measuring that I study should supported the
quality the standard of Measurements, Second Edition (SMM2) by the
Royal establishment of Surveyors, Malaysia. It has improved
my writing ability for the outline of building works.
At the conclusion of this semester, I will simply twist out the
measuring work and make a scientific take-off quantities and Bill of Quantities
(BQ) for brickwork, stud partitions, staircase structure, staircase finishes
and balustrade, floor, wall and ceiling and precast concrete piling from the
draft. I may also simply mark and illustrate the variations in writing
description consistent with the design changes within the drawing. At last, I
might wish to appreciate to our lecture, Ms Habizah, Sheikh IImi teaching us
and granting us more information and this information is very important and helpful to me within the future once I am operating in a working firm.
No comments:
Post a Comment